If you privately let a home in one of Birmingham's 25 selective licensing wards, you need a council licence unless an exemption or the HMO licensing rules apply. Check the exact address, gather the council's documents and apply through Birmingham City Council's own service, with a published fee of £700 per property.
This England-only guide was checked on 16 November 2026. Fees, boundaries and application instructions can change: re-check the council pages before applying. It covers the local application, not the separate national landlord register.
Do I need a landlord licence in Birmingham?
Yes, if your privately rented home is inside the designated area and is not exempt or subject to HMO licensing instead. An ordinary single-family house or flat can need a selective licence; owning only one rental does not remove the requirement.
The council's designation notice records government confirmation on 5 September 2022. The scheme began on 5 June 2023 and is due to cease on 4 June 2028, unless revoked earlier. It remains in force on the checked date.
Birmingham described it at approval as the UK's largest scheme, covering an estimated 40,000 to 50,000 properties. That is the council's published estimate, not a count of licences issued today.
For the general differences between the three licence types, use our landlord licence decision guide. The steps below focus on Birmingham's selective application.
Which Birmingham wards are covered, and how do I check my address?
The scheme covers 25 named wards, rather than the whole city. The designation lists:
| Covered wards | Covered wards | Covered wards |
|---|---|---|
| Acocks Green | Alum Rock | Aston |
| Balsall Heath West | Birchfield | Bordesley Green |
| Bordesley and Highgate | Bournbrook and Selly Park | Edgbaston |
| Gravelly Hill | Handsworth | Heartlands |
| Holyhead | Ladywood | Lozells |
| North Edgbaston | Small Heath | Soho and Jewellery Quarter |
| South Yardley | Sparkbrook and Balsall Heath | Sparkhill |
| Stockland Green | Tyseley and Hay Mills | Ward End |
| Yardley West and Stechford |
Use the council's Check my ward address checker: enter the full postcode, choose the property and check its result. A broad neighbourhood name is not enough near a boundary. Keep a dated copy of your result with the application records; ask the licensing team if the address is missing or unclear.
For other properties, our council licensing hub links to the councils it covers. This Birmingham application goes through the council itself.
Which properties are exempt or need an HMO licence instead?
Homes requiring a Part 2 HMO licence are excluded from this selective designation. Birmingham's additional HMO guidance covers smaller shared homes with three or four people, at least two households and shared facilities; larger qualifying shared homes need a mandatory HMO licence. Check that route before paying for selective licensing.
The designation also excludes registered-social-landlord lettings, homes under relevant management orders or temporary exemptions, and the statutory categories in the 2006 exemptions order. These include qualifying educational accommodation, genuine holiday lets and certain resident-landlord arrangements. Read the exact conditions rather than assuming a label creates an exemption.
The council says an empty property does not need a selective licence. A temporary exemption is a separate council process, not something a landlord can simply declare.
What is the selective licensing Birmingham fee?
The published fee is £700 for each property, split into two payments. The council's payment guidance says:
| Payment | Amount | When taken |
|---|---|---|
| Part A | £375 | When you apply |
| Part B | £325 | When the council decides to grant your draft licence |
| Total | £700 | £375 plus £325 |
You authorise the council to take the payments from a debit or credit card. This is not an instalment plan. There is no multiple-property discount; the current guidance publishes no general discounted rate. Check again before budgeting.
Fees are not linked to the licence's length, and cancelling early does not produce a refund. Budget for a fresh application if the licence holder changes: licences cannot be transferred to a buyer or replacement licence-holding agent.
What documents should I prepare before applying?
Prepare the council's six-item application checklist before starting the form. Its application page, updated on 5 November 2026, asks for:
- Names and contact details of people with an interest in the property, including the owner, freeholder or mortgage company.
- The proposed licence holder's date of birth.
- Every room's measurements in square metres, plus its position within the building.
- The current electrical installation inspection and test certificate.
- The latest gas safety certificate, where applicable.
- A debit or credit card for payment.
Keep the address consistent across your documents and record room positions clearly. A certificate for a different flat is not evidence for this application. Keep your EPC and tenancy records organised too, but do not substitute them for the electrical and gas evidence requested above.
How do I apply for a selective licence in Birmingham?
Start from the council's application page and follow its link to the council's online licensing service. Create an account, enter the property and licence-holder information, supply the requested evidence and complete the payment authorisation.
You can save progress and return later; issued licences and associated documents are stored in the service. Saving a draft is a preparation step, so retain evidence of the actual submission and payment.
Choose the licence holder deliberately. Under Housing Act 2004 section 88, the council considers suitability, including whether the proposed holder and manager are fit and proper and the management arrangements satisfactory. An agent completing the form does not automatically settle who should hold the licence.
How long does the licence last, and what happens afterwards?
Birmingham says a licence lasts at most five years from when the application is deemed duly made. Record the actual dates on the issued licence. Section 91 allows a licence to continue beyond the designation's end, so do not automatically replace its expiry date with 4 June 2028.
Read the council's licence conditions. They include keeping tenant references or evidence of attempts, providing written occupation terms, recording rent payments and notifying material changes within 14 days. They also require an inventory agreed with each tenant at the start of occupation, and written waste and recycling information within seven days of it starting.
Keep those tasks beside your certificate dates. The compliance deadline checker covers the wider certificate timetable; the issued licence remains your authority for its own conditions and dates.
What does an illustrative application timeline look like?
It separates preparation, submission, payment and the eventual licence decision. This example is illustrative: Sam is preparing a vacant single-household let at fictional house number 12 in Aston, a ward expressly included in the designation. No real street or property is asserted.
| Date or event | Sam's action | Evidence or amount |
|---|---|---|
| 2 November 2026 | Checks the intended property's full address using the council tool | Saves the result confirming the included ward |
| 3 November 2026 | Assembles the six checklist items, including room measurements and current certificates | One complete application folder |
| 4 November 2026 | Submits the completed council application and payment authority | £375 Part A; retains receipt |
| When the council decides to grant the draft licence | Checks the draft and second payment | £325 Part B; total £700 |
| When the licence is issued | Records its actual start, expiry and conditions | Maximum five years from the duly-made application date |
Preparation here takes two days from 2 to 4 November. No decision date or approval timescale is assumed. If the application were duly made on 4 November 2026, the five-year anniversary would be 4 November 2031; that arithmetic does not promise that term. Sam checks the issued licence and lawful letting position before occupation.
What if I apply late or let without a licence?
Apply promptly and contact the council if the property should already be licensed; a late application does not erase earlier unlicensed operation. Section 95 creates the offence and includes a defence where an application was duly made and remains effective. An unfinished draft is not that defence.
The current council page warns of a civil penalty up to £40,000, or prosecution with an unlimited fine. Tenants can also seek a rent repayment order for the licensing offence, as GOV.UK explains.
Approval is not automatic: the council asks applicants who have heard nothing within 28 days to contact it. That is a chasing point, not permission to assume approval. Do not try to solve licensing problems through harassment or unlawful eviction; GOV.UK confirms both can be criminal offences.
Does this licence replace the national PRS register?
No. The council licence and national registration are separate duties, explained in our selective licensing and PRS database guide.
GOV.UK's current registration guidance gives the West Midlands window as 15 December 2026 to before midnight on 14 March 2027 for occupied properties in scope. That later deadline does not postpone Birmingham's existing licensing requirement. Use our national rental registration page for that separate task, and keep the two application records distinct.
General information checked on 16 November 2026, not legal, tax or financial advice. Confirm your address, fee and circumstances with Birmingham City Council before relying on this guide.





